A carbon plant was shut down in Shandong province of China

Except the cathode carbon block is produced outside the plant for electrolytic aluminum industry.At the same time, the production capacity of carbon anode is 120000 tons / year.Some of the process equipment comes from following companies: BP Company in America, EIRICH Company and SHENCK Company in Germany.

 

Mr.Xiang visited the production line in 2004,The factory was full load production and it’s very promising for the groupat at that time.

 

For the lack of cost advantage, rapid response mechanism and countermeasure for the rapid changing of the external environment for a time since the enterprise established, the enterprise had gradually lost their competitive advantage and been under deficit for a long time.

 

The company has no profit or loss is long-term status, production and management difficult,So board of directors decided to stop production.